Before I start this post let me state that no, I do not know when we will be reopening.
As many of you know, BHPL is in the process of relocating to a temporary location for approximately two years while the new municipal complex is being built. Our current home, a former convent/rectory, is proving as challenging as we expected. We are dividing the collection (books, AV materials, internet computers) throughout the rooms and scattering tables and chairs wherever something will fit. It will be a cozy two years.
110 Roosevelt Ave, where the library will temporarily be located. |
Stained glass inside the temporary library |
Finally, I arrived at Plainfield Public – designed and built to be a library. I felt lucky to work in such a lovely, but totally impractical building. The pool and fountain court on the lower level absorbed noise and provided a soothing background, but added way too many steps to retrieve anything on the opposite side. One time I had actually had a live otter program in the pool. It also served as the perfect receptacle for the water leaking through the large skylight. Also, think twice about designing a predominantly glass building on a main street with truck traffic.
BHPL came next. The front half of the building dated to 1928 as Mt. Carmel Hall. A large addition was added to both levels in 1965 and numerous small additions were added over the years. My office had an interior cinder block wall and closed over window left from moving the entrance. A stairway to nowhere is hidden behind a door in the Meeting room. Building codes changed over the years as more attention was given to barrier free access and ADA regulations.
What will be the children's room (photo taken right after the move) |